Rasp Blasting Schedule

Sunday 22nd of December, 2024.

BHO will fire a Production Stope Blast for 2,257t at 6:45 PM on the  22nd of December, 2024 at Rasp Operations – SBR 11L 270 DH- SHOT 1. The Blast has been modelled to comply with Blasting Overpressure and Vibration conditions.

The Call home log has been checked, all the required Overpressure and Vibration monitors have called in today and are operational for the anticipated firing.